    Timeline:  From 2015 to 2018   
    Location:  Vientiane, Lao PDR
    Funding:  AESN, SIAAP, AIMF (French decentralized cooperation bodies) & Vientiane municipality
    Description:  Detailed design and works supervision of the construction of the capital’s sludge treatment facility construction, Sludge collection and processing treatment and management
    Positions/Staff:  Team leader, waste water experts, design engineers, treatment facility manager


    Timeline: 2015
    Location:
    Vientiane, Lao PDR
    Funding:
    AESN, SIAAP, AIMF (French decentralized cooperation bodies) & Vientiane municipality
    Description:
    Environmental Impact Assessment for sludge treatment plant
    Positions/Staff:
    Team leader, Surveyors


    Timeline: 2015-2016
    Location:
    Khammuan, Oudomsay, Luang Prabang provinces, Lao PDR
    Funding:
    WHO (United Nations World Health Organization)
    Description:
    Survey, design and construction of water quality securing assets in semi urban areas
    Positions/Staff:
    Hydraulics expert, Civil engineer

    Timeline:
    2016
    Location:
    Hue, Vietnam
    Funding: SIAPP
    Description:
    Technical assistance for starting process treatment plant for solid waste leachate processing additionally to fecal sludge
    Positions/Staff:
    Sanitation expert


    Timeline:
    2016
    Location:
    Lao PDR
    Funding:
    AFD (French Development Agency)
    Description:
    Technical Assistance for Vientiane capital water authority on GIS, modelling, leak mitigation, services restructuring
    Positions/Staff:
    Team leader, Hydraulics expert


    Timeline: 2012-2016
    Location:
    Majunga city, Madagascar
    Funding:
    European Union
    Description: I
    mplementation of a fecal sludge management peri-urban  project
    Positions/Staff:
    Sanitation expert


    Timeline: 2014-2015
    Location:
    Kara city, Togo
    Funding:
    SIAAP
    Description:
    Managing construction project on improving waste water treatment plant
    Positions/Staff:
    Sanitation expert


    Timeline: 2013-2015
    Location:
    Tamatave city, Madagascar
    Funding:
    French cooperation
    Description:
    Sludge management project, Preliminary design of the treatment plant, Sludge characterization survey, Humus valorization market study
    Positions/Staff:
    Team leader, Agronomic expert, Sanitation expert, GIS/CAD operator, Surveyor


    Timeline: 2013-2014
    Location:
    Lao PDR
    Funding:
    AESN, SIAAP, AIMF (French decentralized cooperation bodies) & Vientiane municipality
    Description:
    Vientiane capital sludge management project, Preliminary design of the treatment plant, Sludge characterization survey, Humus valorization market study
    Positions/Staff:
    Team leader, Agronomic expert, Sanitation expert, GIS/CAD operator, Surveyor


    Timeline: 2013-2014
    Location:
    Hue, Vietnam
    Funding:
    SIAAP
    Description:
    Technical assistance for upgrading existing treatment plant for solid waste leachate processing additionally to fecal sludge
    Positions/Staff:
    Sanitation expert


    Timeline:
    2013-2014
    Location:
    Vientiane, Lao PDR 
    Funding:
    French Development Agency (AFD) & Vientiane Water Authority (NPNL)
    Description:
    Vientiane capital water supply system master plan
    Positions/Staff:
    Team leader, Modelling expert, GIS/CAD operator, Water supply expert


    Timeline: 2013-2014
    Location: 
    Afghanistan
    Funding:
    ICRC (International Committee of The Red Cross)
    Description:
    Feasibility study and detailed design of a wastewater treatment system for large places of detention in Afghanistan
    Positions/Staff:
    Team leader, Designer, CAD operator

     
    Timeline:
    2013
    Location:
    Tomoasina, Madagascar
    Funding:
    SIAAP
    Description:
    Market survey for implementing a sustainable sludge management system
    Positions/Staff:
    Team leader


    Timeline:
    2013
    Location:
    Vientiane, Lao PDR (Detention center)
    Funding:
    ICRC (International Committee of The Red Cross)
    Description:
    Diagnostic of the water supply of detention center, topographic mapping of the center, borehole supervision and pump testing, rehabilitation of water assets.
    Positions/Staff:
      Team leader, engineer, topographer, hydro geologist


    Timeline: 2012-2013
    Location:
    Pak Ngum, Lao PDR
    Funding:
    French Development Agency (AFD)
    Description:
    Supervision of water supply system construction including  survey for underground water and surface treatment process
    Positions/Staff:
    Team leader, supervisor, engineer
      
     

    Timeline: 2012
    Location:
    KARA, Togo
    Funding:
    SIAAP
    Descriptoin:
    Feasibility and detailed design survey for waste water treatment plant (ABR, horizontal planted filter)
    Positions/Staff:
    Team leader, sanitation expert, civil engineer

    Timeline: 2013/2014
    Location:
    Lao PDR
    Funding:
    French Development Agency (AFD)
    Descriptoin:
    Technical Asssistance for GIS applied to asset management and planning, hydraulics modeling
    Positions/Staff:
    Team Leader, modeling expert, GIS/DATA expert, GIS trainer (3 trainers)
       

    Timeline: 2012/2013
    Location:
    Luang Prabang, Lao PDR
    Funding:
    French Development Agency (AFD)
    Descriptoin:
    Technical Assistance for the waste and storm water master plan of urban Luang Prabang
    Positions/Staff:
    Storm water modeling expert, environmental impact expert, design expert


    Timeline: 2011/2012/2013
    Location:
    Vientiane, Savannakhet, Lao PDR
    Funding:
    WTA
    Description:
    Survey and presentation of urban sludge management alternatives and strategies
    Positions/Staff:
    Coordinator, Sanitation expert, Surveyor


    Timeline: 2012
    Location:
    Vientiane, Lao PDR
    Funding:
    Asian Development Bank (ADB)
    Description:
    Training of Ministry, provinces and consulting firms staff on physical data collection, processing for water supply systems design
    Positions/Staff:
    2 trainers


    Timeline: 2011/2012/2013/2014
    Location:
    Vientitane, Lao PDR
    Funding:
    French Development Agency (AFD)
    Description:
    Technical assistance on leaks mitigation of the water supply system, supervision of replacement of GSP pipes
    Positions/Staff:
    Team leader, 2 senior field engineers, 3 supervisors


    Timeline: 2010/2012
    Location:
    Vientitane, Lao PDR
    Funding:
    French Development Agency (AFD)
    Description: 
    Calibration of the numerical model of Vientiane municipality water supply
    Positions/Staff:
    Team leader, 2 Modeling experts, 2 GIS experts, 2 Water supply expert, 5 surveyors


    Timeline: 2011
    Location:
    Port-Gentil, Gabon 
    Funding:
    AESN
    Description:
    Strategic support for project deployment  of UDDT and Feacal Sludge Management
    Positions/Staff: Team leader


    Timeline: 2010
    Location:
    Savannakhet, Lao PDR
    Funding:
    UN HABITAT
    Description: 
    Design of the pro – poor sanitation policy, design of the water demand and conservation strategy in the Phine district, field and socioeconomic surveys.
    Positions/Staff: 
    Team leader, socio-economist, 6 surveyors


    Timeline: 2010
    Location:
    Hin Hueb, GRET
    Funding:
    Team leader, sanitation expert, surveyors and CAD operators
    Description:
    Waste water treatment plant design, ABR and reed planted beds design, ABR and reed planted beds design
    Positions/Staff:
     
    Team leader, sanitation expert, surveyors and CAD operators


    Timeline: 2009/2010
    Location:
    Lao PDR (nationwide)
    Funding:
    World Bank
    Description:
    Water and sanitation sector review in order to define future World bank investment scheme
    Positions/Staff:
    Field survey team leader, 6 surveyors


    Timeline: 2008/2009/2010
    Location:
    Savannakhet, Lao PDR
    Funding:
    UN HABITAT
    Description:
    Cross-border town sanitation project in 3 districts: drainage, treatment and solid waste management
    Positions/Staff:
    Team leader, 1 design engineer, 1 trainer, 1 site engineer, 1 coordinator, 9 surveyors


    Timeline: 2010
    Location:
    Lao PDR
    Funding:
    UN HABITAT
    Description:
    IEE and master plan, GIS, socioeconomic surveys, sanitation tariff design
    Positions/Staff:
    Team leader, 1 design engineer, 1 trainer, 1 site engineer, 1 coordinator, 9 surveyors


    Timeline: 2008
    Location:
    Savannakhet, Lao PDR
    Funding:
    SNV
    Description:
    Sub contractor for data collection concerning a water and sanitation survey
    Positions/Staff:
    Team leader, 2 surveyors


    Timeline: 2008
    Location:
    Savannakhet, Lao PDR
    Funding: UN Habitat
    Description:
    Study on affordability and willingness to pay for water supply and sanitation, prevailing price setting policy and review of water supply network and sanitation facilities in Phine, Savannakhet, Lao PDR
    Positions/Staff:
    Team leader, 4 engineers, 8 surveyors


    Timeline: 2008/2010
    Location: Vientiane province, Lao PDR
    Funding:
    French Development Agency (AFD)
    Description:
    Project management of a urban water supply network extension and water facilities building  (104 Km AEP 2 project), zoning survey, anti water hammer survey
    Positions/Staff: Team leader, 1 coordinator, 1 expert, 2 engineers, 3 supervisors 


    Timeline:
    2008
    Location:
    Savannakhet, Lao PDR - Kaysone district
    Funding:
    Savannakhet  state irrigation company
    Description:
    Project management of a waste water drainage system
    Positions/Staff:
    Design engineer, 1 draftsman

    Timeline: 2007    
    Location: Savannakhet, Lao PDR (Xethamuak, Phine disctrict)
    Funding:
    WTA
    Description: Survey and design of a water supply scheme (socioeconomic survey, aquifer test, distribution network), assistance to the district in the fundraising process (bilateral funds).
    Positions/Staff: T
    eam leader, 1 socio-economist, 1 hydro geologist, 1 coordinator, 1 topographer, 8 surveyors
       

    Timeline: 2007
    Location:
    Vientiane, Lao PDR (Met district)
    Funding:
    Luxembourg Development Agency
    Description:
    Technical assessment of a rural gravity fed water supply system
    Positions/Staff:
    Design engineer, 2 technicians


    Timeline: 2007
    Location:
    Luang Namtha, Lao PDR
    Funding:
    Aquassistance
    Description:
    Building two concrete 100 m3 capacity water tanks. Design and set up of tender documents
    Positions/Staff:
    Team leader, 1 design engineer, 1 draftsman 


    Timeline: 2006
    Location:
    D.R. Congo
    Funding:
    French, German, Belgian and Congolese Red Cross
    Description: Water and sanitation  survey and master plan scheme design of Bukavu city (500 000 inhabitants)
    Positions/Staff:  Team leader, 1 engineer, 3 draftsmen, 5 surveyors


    Timeline: 2006
    Location:
    Savannakhet, Lao PDR
    Funding:
    Handicap International
    Description:
    Survey and design of an operation and maintenance project of rural water supply systems
    Positions/Staff:
    Team leader, 1 engineer, 1 draftsman


    Timeline: 2005
    Location:
    Sri Lanka
    Funding: ACTED
    Description:
    Design of a rural development and flood mitigation project (irrigation, roads, watsan), fund raising - $ 4.5 million.
    Positions/Staff:
    Team leader, 1 engineer, 1 technician


    Timeline:  2005
    Location:
    Vietnam
    Funding: 
    Ho Chi Minh Ville municipality
    Description:
    Design and project documents of a water treated opened channel leisure park scheme
    Positions/Staff:
    Design engineer, 1 draftsman